bridge break In the municipality of Pozoblanco, we have carried out the integral energy rehabilitation of the existing envelope of the swimming pool, to create a new efficient envelope system combining a retractable roof and a retractable carpentry enclosure with thermal bridge break between pillars and placement with low emissivity glass.
In addition, a new air-conditioning system has been installed, driven by two dehumidifiers, which will improve the air-conditioning of the swimming pool. With this new project, the thermal and insulation characteristics of the existing infrastructure are improved, achieving a reduction in CO2 emissions into the atmosphere.
>