News

Magtel constructs a PV solar farm at Covap facilities for its new circular economy model
Present

Magtel constructs a PV solar farm at Covap facilities for its new circular economy model


The project, with an investment of 25 million euros, aims to cover 80% of its energy needs with renewable sources. Magtel contributes to the new circular economy model that Covap will have implemented in 2024. The tech company is building a photovoltaic solar farm at the...
Magtel takes part in the editorial roundtable at El Día on the change that will be led from Cordoba in military logistics through the BLET
Present

Magtel takes part in the editorial roundtable at El Día on the change that will be led from Cordoba in military logistics through the BLET


Company Vice-president Isidro López Magdaleno and Managing Director Martín Salgado Devincenzi took part in this debate forum on the military base The Cordoba City Council, Regional Government of Andalusia, CECO and the Army set out the keys with Magtel of what this...
Energy

Magtel sets out the advantages of reverse-flow hydropower plants at Genera


Energy storage, key for the decarbonisation of the electricity system Magtel Hydro and Environment Director, Arturo Buenaventura, participated in a panel on energy storage moderated by the Spanish Association for Energy Storage (ASEALEN), which was held during the 2021...
News

Validation of a new photovoltaic plant concept with thermal cogeneration


The Solar Blue initiative demonstrates the feasibility of producing solar photovoltaic and concentrated solar thermal power and will drive a new generation of selective filters for adaptation and use in different situations Magtel's R&D&I Division has completed the...
Isidro López Magdaleno takes part in the third workshop on ‘Army Logistics Base, towards predictive logistics’
Present

Isidro López Magdaleno takes part in the third workshop on ‘Army Logistics Base, towards predictive logistics’


The Magtel vice-president took part, representing CECO, in the conference held on the INTA campus in La Marañosa (Madrid) CECO took part in the third workshop entitled ‘The Army Logistics Base, towards predictive logistics’, which was held on 20 October at the...
Magtel’s managing director says establishing alliances between companies is key to handle the challenge of post-Covid Andalusia
Present

Magtel’s managing director says establishing alliances between companies is key to handle the challenge of post-Covid Andalusia


Martín Salgado pointed out that sustainability, innovation, digitalisation and lifelong training of teams are the main keys in the business growth strategy Participation at the Economic Forum organised by newspapers El Español and Invertia The managing director of...
News

Magtel will provide service to over 200,000 homes and will strengthen Orange’s mobile network, with views to 5G implementation


The roll-out of the fixed and mobile networks will be implemented in Andalusia, Extremadura and the central region Execution is planned until 2022 Magtel will enable service for over 200,000 households and will contribute to strengthening Orange’s mobile network in...
News

The hybrid technology of the project Dragon will improve the lifetime of existing lithium batteries by 15%


The initiative, in which Magtel participates and which has two European partners, combines lithium-ion batteries and supercapacitors Magtel has successfully completed the Dragon project developed in the company's Industry 4.0 laboratory. This initiative, which started in...
Magtel develops the new citizen services system for the Cordoba City Council
Present

Magtel develops the new citizen services system for the Cordoba City Council


The aim of the project is to enhance quality in undertaking bureaucratic procedures for the city council through new e-administration tools. It will be available to citizens starting today, Friday 18 June The company was the successful bidder for executing the new...
Magtel deploys more than 7,500 kilometres of fibre  optic for FTTH projects since 2013
Present

Magtel deploys more than 7,500 kilometres of fibre optic for FTTH projects since 2013


We participate in the main telecommunications projects in the country Since its inception in the 1990s, Magtel has deployed fibre optics for Telefónica's rings in Cordoba, as well as for the Enagás gas pipeline between Seville and Ciudad Real. Since then, it has been...