Construction of photovoltaic park located in Zaragoza for the company Opdenergy.
The project includes the construction of two photovoltaic plants, Larral and La Peñaza 3, with an access capacity of 54.99 MWp and 15.73 MWp, respectively, as well as a 30/132 kV medium and high voltage electrical substation, which will transform the energy evacuated by the two plants. An overhead high voltage line will also be constructed.
The aim of the project is to supply approximately 35,000 households with clean energy, thereby contributing to the decarbonisation process
towards which society is moving. These figures are equivalent to the planting of 140,000 trees.
>