Specifically, the project has considered the deployment of 16,000 metres of medium voltage (25 kv – LA 110/180) grid in difficult-to-access zones, such as the La Molina Ski Station, Valle de Nuria, Valle de Ribes, Valle de Mongroni or Dorria, all in Catalonia.

Main features
- 16,000 metres of MV network (25 kv – LA 110/180).
- Installation of metal towers on gradients of up to 65% by means of a helicopter.
- Drilling of holes for the placement of plinths for towers up to 32 metres high.
- Access on medium textured and rocky land by means of drilling and expansive cement.
- Installation of mountain tracks and roads for vehicle access.
- Equipment and vehicles adapted to mountain atmospheric conditions.