			Execution of the Marchamorón substation, which includes two 225MVA 220/30kV power transformers and a high voltage line for interconnection.
The project also includes the construction of the building and installation of the transformers and other HV/MV electrical equipment, as well as the erection of supports and cable laying.
The project is being developed in Alcalá de Guadaíra (Seville) for Solarpack Ingeniería SL.
 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	>
 
                     
                     
                    