 
			
			
			
			
			 
			
			
			
			Located in Sierra de Yeguas (Malaga), the wind farm will have a capacity of 15 MW. As part of this infrastructure, our Energy Division has carried out the construction of the 30 kV double-circuit overhead power line in La Roda de Andalucía (Seville), which will serve to evacuate the afore-mentioned wind farm.
 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
	 	 		 
	 	 	 
            >
 
                     
                     
                    