Execution of the Marchamorón substation, which includes two 225 MVA 220/30 kV power transformers and a High Voltage Line for interconnection, developed in Alcalá de Guadaíra (Seville) for Solarpack Ingeniería S.L.
The project also includes the construction of the building and the installation of the transformers and other HV/MV electrical equipment, as well as the erection of supports and cable stringing.
>