Detailed engineering for Marchamorón substation and 220 kV LAAT

Detailed engineering for Marchamorón substation and 220 kV LAAT
  • > Desarrollado para: Solarpack Ingeniería S.L.
  • > Tipología: Subestación eléctrica y equipos AT/MT
  • > Localización: Alcalá de Guadaría (Sevilla)

Detailed engineering for Marchamorón substation and 220 kV LAAT


Substation and High Voltage Line

Execution of the Marchamorón substation, which includes two 225 MVA 220/30 kV power transformers and a High Voltage Line for interconnection, developed in Alcalá de Guadaíra (Seville) for Solarpack Ingeniería S.L.

The project also includes the construction of the building and the installation of the transformers and other HV/MV electrical equipment, as well as the erection of supports and cable stringing.