{"id":34997,"date":"2026-09-07T09:50:51","date_gmt":"2026-09-07T07:50:51","guid":{"rendered":"https:\/\/magtel.es\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/"},"modified":"2026-09-07T09:59:59","modified_gmt":"2026-09-07T07:59:59","slug":"dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas","status":"publish","type":"post","link":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/","title":{"rendered":"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba"},"content":{"rendered":"\n<p>The temporary joint venture (UTE) formed by <a href=\"https:\/\/www.dragados.com\/\" type=\"link\" id=\"https:\/\/www.dragados.com\/\">Dragados<\/a>, <a href=\"https:\/\/heliopol.es\/\" type=\"link\" id=\"https:\/\/heliopol.es\/\">Heliopol <\/a>and Magtel has been awarded the contract to build the main infrastructure for the future <a href=\"https:\/\/ejercito.defensa.gob.es\/estructura\/ejercito35\/base_logistica\/index.html\" type=\"link\" id=\"https:\/\/ejercito.defensa.gob.es\/estructura\/ejercito35\/base_logistica\/index.html\">Spanish Army Logistics Base<\/a> (BLET) in C\u00f3rdoba, a project promoted by the Ministry of Defence to bring together capabilities currently spread across different locations across the country.<\/p>\n\n\n\n<p>The contract, awarded for <strong>\u20ac278.5 million<\/strong>, corresponds to <strong>Lot 1<\/strong> of the project and covers the construction of the logistics and weapons systems maintenance infrastructure for the future Spanish Army Logistics Base. The works will be carried out on the <strong>La Rinconada site<\/strong>, where associated urbanisation works are already progressing, and will have an execution period of <strong>36 months<\/strong> from the final formalisation of the contract.<\/p>\n\n\n\n<p>The Spanish Army Logistics Base is one of the Ministry of Defence\u2019s flagship projects aimed at transforming and modernising the Army\u2019s logistics network. The development includes the construction of <strong>around thirty buildings and facilities<\/strong> that will make up the future military complex.<\/p>\n\n\n\n<p>The project is progressing alongside other planned developments in La Rinconada, including the future <strong>Gran Capit\u00e1n Business Park<\/strong>, which is linked to the area&#8217;s industrial and logistics activities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The temporary joint venture (UTE) formed by Dragados, Heliopol and Magtel has been awarded the contract to build the main infrastructure for the future Spanish Army Logistics Base (BLET) in C\u00f3rdoba, a project promoted by the Ministry of Defence to bring together capabilities currently spread across different locations across the country. The contract, awarded for&#8230;<\/p>\n","protected":false},"author":2,"featured_media":34994,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1933,910],"tags":[1934,1659,1935,1936,1937,928,1938],"class_list":["post-34997","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-defensa","category-present","tag-base-logistica-del-ejercito-de-tierra","tag-cordoba","tag-dragados","tag-heliopol","tag-la-rinconada","tag-magtel-en","tag-ministerio-de-defensa"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba - Magtel<\/title>\n<meta name=\"description\" content=\"Dragados, Heliopol y Magtel construir\u00e1n la Base Log\u00edstica Ej\u00e9rcito Tierra en C\u00f3rdoba con una inversi\u00f3n de 278,5 millones de euros.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba - Magtel\" \/>\n<meta property=\"og:description\" content=\"Dragados, Heliopol y Magtel construir\u00e1n la Base Log\u00edstica Ej\u00e9rcito Tierra en C\u00f3rdoba con una inversi\u00f3n de 278,5 millones de euros.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/\" \/>\n<meta property=\"og:site_name\" content=\"Magtel\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-07T07:50:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-07T07:59:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1912\" \/>\n\t<meta property=\"og:image:height\" content=\"1006\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Magtel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Magtel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/\"},\"author\":{\"name\":\"Magtel\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\"},\"headline\":\"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba\",\"datePublished\":\"2026-09-07T07:50:51+00:00\",\"dateModified\":\"2026-09-07T07:59:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/\"},\"wordCount\":209,\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/base-logistica-Cordoba.jpg\",\"keywords\":[\"Base Log\u00edstica del Ej\u00e9rcito de Tierra\",\"C\u00f3rdoba\",\"Dragados\",\"Heliopol\",\"La Rinconada\",\"Magtel\",\"Ministerio de Defensa\"],\"articleSection\":[\"Defensa\",\"Present\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/\",\"name\":\"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba - Magtel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/base-logistica-Cordoba.jpg\",\"datePublished\":\"2026-09-07T07:50:51+00:00\",\"dateModified\":\"2026-09-07T07:59:59+00:00\",\"description\":\"Dragados, Heliopol y Magtel construir\u00e1n la Base Log\u00edstica Ej\u00e9rcito Tierra en C\u00f3rdoba con una inversi\u00f3n de 278,5 millones de euros.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/base-logistica-Cordoba.jpg\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/base-logistica-Cordoba.jpg\",\"width\":1912,\"height\":1006},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/magtel.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"name\":\"Magtel\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/magtel.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\",\"name\":\"Magtel\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"width\":1808,\"height\":407,\"caption\":\"Magtel\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\",\"name\":\"Magtel\",\"sameAs\":[\"https:\\\/\\\/www.magtel.es\\\/\"],\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/author\\\/magtel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba - Magtel","description":"Dragados, Heliopol y Magtel construir\u00e1n la Base Log\u00edstica Ej\u00e9rcito Tierra en C\u00f3rdoba con una inversi\u00f3n de 278,5 millones de euros.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/","og_locale":"en_US","og_type":"article","og_title":"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba - Magtel","og_description":"Dragados, Heliopol y Magtel construir\u00e1n la Base Log\u00edstica Ej\u00e9rcito Tierra en C\u00f3rdoba con una inversi\u00f3n de 278,5 millones de euros.","og_url":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/","og_site_name":"Magtel","article_published_time":"2026-09-07T07:50:51+00:00","article_modified_time":"2026-09-07T07:59:59+00:00","og_image":[{"width":1912,"height":1006,"url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba.jpg","type":"image\/jpeg"}],"author":"Magtel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Magtel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#article","isPartOf":{"@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/"},"author":{"name":"Magtel","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac"},"headline":"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba","datePublished":"2026-09-07T07:50:51+00:00","dateModified":"2026-09-07T07:59:59+00:00","mainEntityOfPage":{"@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/"},"wordCount":209,"publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"image":{"@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba.jpg","keywords":["Base Log\u00edstica del Ej\u00e9rcito de Tierra","C\u00f3rdoba","Dragados","Heliopol","La Rinconada","Magtel","Ministerio de Defensa"],"articleSection":["Defensa","Present"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/","url":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/","name":"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba - Magtel","isPartOf":{"@id":"https:\/\/magtel.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#primaryimage"},"image":{"@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba.jpg","datePublished":"2026-09-07T07:50:51+00:00","dateModified":"2026-09-07T07:59:59+00:00","description":"Dragados, Heliopol y Magtel construir\u00e1n la Base Log\u00edstica Ej\u00e9rcito Tierra en C\u00f3rdoba con una inversi\u00f3n de 278,5 millones de euros.","breadcrumb":{"@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#primaryimage","url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba.jpg","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba.jpg","width":1912,"height":1006},{"@type":"BreadcrumbList","@id":"https:\/\/magtel.es\/en\/dragados-heliopol-magtel-base-logistica-ejercito-tierra-cordoba-mostrar-mas-lineas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/magtel.es\/en\/"},{"@type":"ListItem","position":2,"name":"Dragados, Heliopol and Magtel to Build the Logistics and Maintenance Infrastructure for the Spanish Army Logistics Base in C\u00f3rdoba"}]},{"@type":"WebSite","@id":"https:\/\/magtel.es\/en\/#website","url":"https:\/\/magtel.es\/en\/","name":"Magtel","description":"","publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/magtel.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/magtel.es\/en\/#organization","name":"Magtel","url":"https:\/\/magtel.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","width":1808,"height":407,"caption":"Magtel"},"image":{"@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac","name":"Magtel","sameAs":["https:\/\/www.magtel.es\/"],"url":"https:\/\/magtel.es\/en\/author\/magtel\/"}]}},"taxonomy_info":{"category":[{"value":1933,"label":"Defensa"},{"value":910,"label":"Present"}],"post_tag":[{"value":1934,"label":"Base Log\u00edstica del Ej\u00e9rcito de Tierra"},{"value":1659,"label":"C\u00f3rdoba"},{"value":1935,"label":"Dragados"},{"value":1936,"label":"Heliopol"},{"value":1937,"label":"La Rinconada"},{"value":928,"label":"Magtel"},{"value":1938,"label":"Ministerio de Defensa"}]},"featured_image_src_large":["https:\/\/magtel.es\/wp-content\/uploads\/2026\/09\/base-logistica-Cordoba-1024x539.jpg",1024,539,true],"author_info":{"display_name":"Magtel","author_link":"https:\/\/magtel.es\/en\/author\/magtel\/"},"comment_info":0,"category_info":[{"term_id":1933,"name":"Defensa","slug":"defensa","term_group":0,"term_taxonomy_id":1933,"taxonomy":"category","description":"","parent":0,"count":1,"filter":"raw","cat_ID":1933,"category_count":1,"category_description":"","cat_name":"Defensa","category_nicename":"defensa","category_parent":0},{"term_id":910,"name":"Present","slug":"present","term_group":0,"term_taxonomy_id":910,"taxonomy":"category","description":"","parent":0,"count":104,"filter":"raw","cat_ID":910,"category_count":104,"category_description":"","cat_name":"Present","category_nicename":"present","category_parent":0}],"tag_info":[{"term_id":1934,"name":"Base Log\u00edstica del Ej\u00e9rcito de Tierra","slug":"base-logistica-del-ejercito-de-tierra","term_group":0,"term_taxonomy_id":1934,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1659,"name":"C\u00f3rdoba","slug":"cordoba","term_group":0,"term_taxonomy_id":1659,"taxonomy":"post_tag","description":"","parent":0,"count":6,"filter":"raw"},{"term_id":1935,"name":"Dragados","slug":"dragados","term_group":0,"term_taxonomy_id":1935,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1936,"name":"Heliopol","slug":"heliopol","term_group":0,"term_taxonomy_id":1936,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1937,"name":"La Rinconada","slug":"la-rinconada","term_group":0,"term_taxonomy_id":1937,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":928,"name":"Magtel","slug":"magtel-en","term_group":0,"term_taxonomy_id":928,"taxonomy":"post_tag","description":"","parent":0,"count":84,"filter":"raw"},{"term_id":1938,"name":"Ministerio de Defensa","slug":"ministerio-de-defensa","term_group":0,"term_taxonomy_id":1938,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"}],"_links":{"self":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/34997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/comments?post=34997"}],"version-history":[{"count":1,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/34997\/revisions"}],"predecessor-version":[{"id":34999,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/34997\/revisions\/34999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media\/34994"}],"wp:attachment":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media?parent=34997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/categories?post=34997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/tags?post=34997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}