{"id":34877,"date":"2026-07-29T11:16:34","date_gmt":"2026-07-29T09:16:34","guid":{"rendered":"https:\/\/magtel.es\/adjudicacion-la-barca-energia-nudo-narcea\/"},"modified":"2026-07-29T12:45:44","modified_gmt":"2026-07-29T10:45:44","slug":"adjudicacion-la-barca-energia-nudo-narcea","status":"publish","type":"post","link":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/","title":{"rendered":"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point"},"content":{"rendered":"\n<p><strong><em><strong>The Ministry for Ecological Transition&#8217;s proposal grants the company 320 MW of grid access capacity for the La Barca Pumped Storage Hydropower Plant project, originally launched by Magtel in 2020.<\/strong><\/em><\/strong><\/p>\n\n\n\n<p><strong>C\u00f3rdoba, 29 July 2026.<\/strong> <a href=\"https:\/\/www.transicionjusta.gob.es\/\" type=\"link\" id=\"https:\/\/www.transicionjusta.gob.es\/\">The Institute for Just Transition<\/a>, a body under Spain&#8217;s Ministry for Ecological Transition and the Demographic Challenge, has awarded La Barca Energ\u00eda grid access and evacuation capacity at the Narcea 400 kV Just Transition node for the CHR La Barca project, an initiative originally launched by Magtel in 2020.<\/p>\n\n\n\n<p><a href=\"https:\/\/magtel.es\/en\/proyectos\/la-barca-reversible-hydroelectric-power-plant-asturias\/\" type=\"link\" id=\"https:\/\/magtel.es\/proyectos\/central-hidraulica-reversible-la-barca-asturias\/\">The <strong>La Barca Pumped Storage Hydropower Plant<\/strong><\/a>, located in Tineo, in south-western Asturias, is a project with <strong>320 MW of installed capacity<\/strong>, <strong>4,092 MWh of energy storage capacity<\/strong>, and <strong>12.79 hours of operational autonomy<\/strong>. It has been conceived as a strategic infrastructure project for large-scale energy storage.<\/p>\n\n\n\n<p>The award process assessed the project&#8217;s socio-economic and environmental commitments within the Just Transition area of south-western Asturias. Key criteria included job creation, training initiatives, support for self-consumption schemes, investment in the regional value chain, participatory financing mechanisms, backing for circular economy initiatives, and biodiversity conservation.<\/p>\n\n\n\n<p>La Barca Energ\u00eda&#8217;s proposal includes the creation of <strong>289 jobs<\/strong> over a period of at least <strong>12 years<\/strong>, with <strong>154 positions reserved for former thermal power plant workers<\/strong>. In addition, <strong>52.24% of the committed workforce will be women<\/strong>.<\/p>\n\n\n\n<p>The CHR La Barca project will therefore play a highly significant role in the development of south-western Asturias. Securing grid access capacity represents a major milestone in the project&#8217;s progress, which will now continue through the processing of the public hydraulic domain concession and the Environmental Impact Assessment declaration.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry for Ecological Transition&#8217;s proposal grants the company 320 MW of grid access capacity for the La Barca Pumped Storage Hydropower Plant project, originally launched by Magtel in 2020. C\u00f3rdoba, 29 July 2026. The Institute for Just Transition, a body under Spain&#8217;s Ministry for Ecological Transition and the Demographic Challenge, has awarded La Barca&#8230;<\/p>\n","protected":false},"author":2,"featured_media":34874,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[918,910],"tags":[1637,1919,1920,1393,1921,1922,1923,1924],"class_list":["post-34877","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-present","tag-almacenamiento-energetico","tag-asturias","tag-central-hidroelectrica-reversible","tag-energia-renovable","tag-infraestructuras-energeticas-2","tag-la-barca-energia","tag-narcea-400-kv","tag-transicion-justa"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point - Magtel<\/title>\n<meta name=\"description\" content=\"La Barca Energ\u00eda obtiene la propuesta de adjudicaci\u00f3n del nudo Narcea 400 kV para impulsar un proyecto estrat\u00e9gico de almacenamiento.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point - Magtel\" \/>\n<meta property=\"og:description\" content=\"La Barca Energ\u00eda obtiene la propuesta de adjudicaci\u00f3n del nudo Narcea 400 kV para impulsar un proyecto estrat\u00e9gico de almacenamiento.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/\" \/>\n<meta property=\"og:site_name\" content=\"Magtel\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-29T09:16:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-29T10:45:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1917\" \/>\n\t<meta property=\"og:image:height\" content=\"1140\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Magtel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Magtel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/\"},\"author\":{\"name\":\"Magtel\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\"},\"headline\":\"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point\",\"datePublished\":\"2026-07-29T09:16:34+00:00\",\"dateModified\":\"2026-07-29T10:45:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/\"},\"wordCount\":278,\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/La-Barca--e1785319158758.jpg\",\"keywords\":[\"almacenamiento energ\u00e9tico\",\"Asturias\",\"Central hidroel\u00e9ctrica reversible\",\"energ\u00eda renovable\",\"Infraestructuras energ\u00e9ticas.\",\"La Barca Energ\u00eda\",\"Narcea 400 kV\",\"Transici\u00f3n justa\"],\"articleSection\":[\"Energy\",\"Present\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/\",\"name\":\"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point - Magtel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/La-Barca--e1785319158758.jpg\",\"datePublished\":\"2026-07-29T09:16:34+00:00\",\"dateModified\":\"2026-07-29T10:45:44+00:00\",\"description\":\"La Barca Energ\u00eda obtiene la propuesta de adjudicaci\u00f3n del nudo Narcea 400 kV para impulsar un proyecto estrat\u00e9gico de almacenamiento.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#primaryimage\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/La-Barca--e1785319158758.jpg\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/La-Barca--e1785319158758.jpg\",\"width\":1917,\"height\":1140},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/adjudicacion-la-barca-energia-nudo-narcea\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/magtel.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"name\":\"Magtel\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/magtel.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\",\"name\":\"Magtel\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"width\":1808,\"height\":407,\"caption\":\"Magtel\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\",\"name\":\"Magtel\",\"sameAs\":[\"https:\\\/\\\/www.magtel.es\\\/\"],\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/author\\\/magtel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point - Magtel","description":"La Barca Energ\u00eda obtiene la propuesta de adjudicaci\u00f3n del nudo Narcea 400 kV para impulsar un proyecto estrat\u00e9gico de almacenamiento.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/","og_locale":"en_US","og_type":"article","og_title":"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point - Magtel","og_description":"La Barca Energ\u00eda obtiene la propuesta de adjudicaci\u00f3n del nudo Narcea 400 kV para impulsar un proyecto estrat\u00e9gico de almacenamiento.","og_url":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/","og_site_name":"Magtel","article_published_time":"2026-07-29T09:16:34+00:00","article_modified_time":"2026-07-29T10:45:44+00:00","og_image":[{"width":1917,"height":1140,"url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758.jpg","type":"image\/jpeg"}],"author":"Magtel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Magtel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#article","isPartOf":{"@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/"},"author":{"name":"Magtel","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac"},"headline":"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point","datePublished":"2026-07-29T09:16:34+00:00","dateModified":"2026-07-29T10:45:44+00:00","mainEntityOfPage":{"@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/"},"wordCount":278,"publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"image":{"@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758.jpg","keywords":["almacenamiento energ\u00e9tico","Asturias","Central hidroel\u00e9ctrica reversible","energ\u00eda renovable","Infraestructuras energ\u00e9ticas.","La Barca Energ\u00eda","Narcea 400 kV","Transici\u00f3n justa"],"articleSection":["Energy","Present"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/","url":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/","name":"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point - Magtel","isPartOf":{"@id":"https:\/\/magtel.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#primaryimage"},"image":{"@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758.jpg","datePublished":"2026-07-29T09:16:34+00:00","dateModified":"2026-07-29T10:45:44+00:00","description":"La Barca Energ\u00eda obtiene la propuesta de adjudicaci\u00f3n del nudo Narcea 400 kV para impulsar un proyecto estrat\u00e9gico de almacenamiento.","breadcrumb":{"@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#primaryimage","url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758.jpg","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758.jpg","width":1917,"height":1140},{"@type":"BreadcrumbList","@id":"https:\/\/magtel.es\/en\/adjudicacion-la-barca-energia-nudo-narcea\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/magtel.es\/en\/"},{"@type":"ListItem","position":2,"name":"The Institute for Just Transition Proposes La Barca Energ\u00eda as Successful Bidder for the Narcea 400 kV Grid Connection Point"}]},{"@type":"WebSite","@id":"https:\/\/magtel.es\/en\/#website","url":"https:\/\/magtel.es\/en\/","name":"Magtel","description":"","publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/magtel.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/magtel.es\/en\/#organization","name":"Magtel","url":"https:\/\/magtel.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","width":1808,"height":407,"caption":"Magtel"},"image":{"@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac","name":"Magtel","sameAs":["https:\/\/www.magtel.es\/"],"url":"https:\/\/magtel.es\/en\/author\/magtel\/"}]}},"taxonomy_info":{"category":[{"value":918,"label":"Energy"},{"value":910,"label":"Present"}],"post_tag":[{"value":1637,"label":"almacenamiento energ\u00e9tico"},{"value":1919,"label":"Asturias"},{"value":1920,"label":"Central hidroel\u00e9ctrica reversible"},{"value":1393,"label":"energ\u00eda renovable"},{"value":1921,"label":"Infraestructuras energ\u00e9ticas."},{"value":1922,"label":"La Barca Energ\u00eda"},{"value":1923,"label":"Narcea 400 kV"},{"value":1924,"label":"Transici\u00f3n justa"}]},"featured_image_src_large":["https:\/\/magtel.es\/wp-content\/uploads\/2026\/07\/La-Barca--e1785319158758-1024x609.jpg",1024,609,true],"author_info":{"display_name":"Magtel","author_link":"https:\/\/magtel.es\/en\/author\/magtel\/"},"comment_info":0,"category_info":[{"term_id":918,"name":"Energy","slug":"energy","term_group":0,"term_taxonomy_id":918,"taxonomy":"category","description":"","parent":910,"count":21,"filter":"raw","cat_ID":918,"category_count":21,"category_description":"","cat_name":"Energy","category_nicename":"energy","category_parent":910},{"term_id":910,"name":"Present","slug":"present","term_group":0,"term_taxonomy_id":910,"taxonomy":"category","description":"","parent":0,"count":103,"filter":"raw","cat_ID":910,"category_count":103,"category_description":"","cat_name":"Present","category_nicename":"present","category_parent":0}],"tag_info":[{"term_id":1637,"name":"almacenamiento energ\u00e9tico","slug":"almacenamiento-energetico","term_group":0,"term_taxonomy_id":1637,"taxonomy":"post_tag","description":"","parent":0,"count":6,"filter":"raw"},{"term_id":1919,"name":"Asturias","slug":"asturias","term_group":0,"term_taxonomy_id":1919,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1920,"name":"Central hidroel\u00e9ctrica reversible","slug":"central-hidroelectrica-reversible","term_group":0,"term_taxonomy_id":1920,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1393,"name":"energ\u00eda renovable","slug":"energia-renovable","term_group":0,"term_taxonomy_id":1393,"taxonomy":"post_tag","description":"","parent":0,"count":4,"filter":"raw"},{"term_id":1921,"name":"Infraestructuras energ\u00e9ticas.","slug":"infraestructuras-energeticas-2","term_group":0,"term_taxonomy_id":1921,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1922,"name":"La Barca Energ\u00eda","slug":"la-barca-energia","term_group":0,"term_taxonomy_id":1922,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1923,"name":"Narcea 400 kV","slug":"narcea-400-kv","term_group":0,"term_taxonomy_id":1923,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1924,"name":"Transici\u00f3n justa","slug":"transicion-justa","term_group":0,"term_taxonomy_id":1924,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"}],"_links":{"self":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/34877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/comments?post=34877"}],"version-history":[{"count":6,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/34877\/revisions"}],"predecessor-version":[{"id":34884,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/34877\/revisions\/34884"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media\/34874"}],"wp:attachment":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media?parent=34877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/categories?post=34877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/tags?post=34877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}