{"id":31910,"date":"2026-09-09T08:37:44","date_gmt":"2026-09-09T06:37:44","guid":{"rendered":"https:\/\/magtel.es\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"},"modified":"2026-09-10T13:22:12","modified_gmt":"2026-09-10T11:22:12","slug":"la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba","status":"publish","type":"post","link":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","title":{"rendered":"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\"><strong>Project award and scope<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The CAF-Magtel consortium has launched the first phase of the contract to modernise the safety systems on the Espeluy-C\u00f3rdoba railway section. The project includes the design and implementation of renewed signalling and control installations along 130 km of the Line 400 corridor, enhancing the safety, reliability and availability of the infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following the contract signing on 4 May 2026 and the initial coordination meetings with ADIF, preliminary site surveys have already been carried out. The detailed design phase is currently underway and is expected to take seven months. Construction works are scheduled to begin in June 2027 and continue until January 2030.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Stations and safety systems<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">New interlockings will be installed at multiple stations along the route, including Rabanales University Campus, Alcolea de C\u00f3rdoba, Villafranca de C\u00f3rdoba, Montoro, And\u00fajar, Espeluy and Ja\u00e9n, among others. CAF and Magtel will also build technical buildings and equipment shelters to house the new signalling systems.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Signalling and train control<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The project also includes the installation of key railway signalling and control systems, including Digital ASFA, LED signals, electromechanical point machines and new train detection technologies. Axle counters will be deployed at stations and on the Ja\u00e9n-Espeluy section, while the remainder of the route will be equipped with audio-frequency track circuits.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Communications and fibre optics<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Magtel will deliver the civil works, dismantling of existing infrastructure and deployment of the primary and secondary fibre-optic networks, including all splicing and connections required to integrate the new field equipment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company will also supply power systems, cabling, substations, backup solutions and operational telephony. Together with CAF, it will deploy train-to-ground communications, CCTV, access control systems and level crossing technologies, further strengthening the modernisation and safety of this strategic railway corridor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project award and scope The CAF-Magtel consortium has launched the first phase of the contract to modernise the safety systems on the Espeluy-C\u00f3rdoba railway section. The project includes the design and implementation of renewed signalling and control installations along 130 km of the Line 400 corridor, enhancing the safety, reliability and availability of the infrastructure&#8230;.<\/p>\n","protected":false},"author":2,"featured_media":31906,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1360,910],"tags":[1700,1701,1702,1703,1704],"class_list":["post-31910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-instalaciones-ferroviarias-proyectos","category-present","tag-caf","tag-fibra-optica","tag-linea-400","tag-seguridad-ferroviaria","tag-ute-caf-magtel"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section - Magtel<\/title>\n<meta name=\"description\" content=\"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section - Magtel\" \/>\n<meta property=\"og:description\" content=\"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion\" \/>\n<meta property=\"og:url\" content=\"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/\" \/>\n<meta property=\"og:site_name\" content=\"Magtel\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-09T06:37:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-10T11:22:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Magtel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Magtel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\"},\"author\":{\"name\":\"Magtel\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\"},\"headline\":\"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section\",\"datePublished\":\"2026-09-09T06:37:44+00:00\",\"dateModified\":\"2026-09-10T11:22:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\"},\"wordCount\":301,\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"keywords\":[\"CAF\",\"fibra \u00f3ptica\",\"L\u00ednea 400\",\"seguridad ferroviaria\",\"UTE CAF\u2011Magtel\"],\"articleSection\":[\"Instalaciones Ferroviarias\",\"Present\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\",\"name\":\"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section - Magtel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"datePublished\":\"2026-09-09T06:37:44+00:00\",\"dateModified\":\"2026-09-10T11:22:12+00:00\",\"description\":\"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"width\":1158,\"height\":772},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/magtel.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"name\":\"Magtel\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/magtel.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\",\"name\":\"Magtel\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"width\":1808,\"height\":407,\"caption\":\"Magtel\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\",\"name\":\"Magtel\",\"sameAs\":[\"https:\\\/\\\/www.magtel.es\\\/\"],\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/author\\\/magtel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section - Magtel","description":"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","og_locale":"en_US","og_type":"article","og_title":"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section - Magtel","og_description":"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion","og_url":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","og_site_name":"Magtel","article_published_time":"2026-09-09T06:37:44+00:00","article_modified_time":"2026-09-10T11:22:12+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119-1024x683.png","type":"image\/png"}],"author":"Magtel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Magtel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#article","isPartOf":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"},"author":{"name":"Magtel","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac"},"headline":"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section","datePublished":"2026-09-09T06:37:44+00:00","dateModified":"2026-09-10T11:22:12+00:00","mainEntityOfPage":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"},"wordCount":301,"publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"image":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","keywords":["CAF","fibra \u00f3ptica","L\u00ednea 400","seguridad ferroviaria","UTE CAF\u2011Magtel"],"articleSection":["Instalaciones Ferroviarias","Present"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","url":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","name":"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section - Magtel","isPartOf":{"@id":"https:\/\/magtel.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage"},"image":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","datePublished":"2026-09-09T06:37:44+00:00","dateModified":"2026-09-10T11:22:12+00:00","description":"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion","breadcrumb":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage","url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","width":1158,"height":772},{"@type":"BreadcrumbList","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/magtel.es\/en\/"},{"@type":"ListItem","position":2,"name":"The CAF-Magtel consortium advances the modernisation of safety systems on the Espeluy-C\u00f3rdoba railway section"}]},{"@type":"WebSite","@id":"https:\/\/magtel.es\/en\/#website","url":"https:\/\/magtel.es\/en\/","name":"Magtel","description":"","publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/magtel.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/magtel.es\/en\/#organization","name":"Magtel","url":"https:\/\/magtel.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","width":1808,"height":407,"caption":"Magtel"},"image":{"@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac","name":"Magtel","sameAs":["https:\/\/www.magtel.es\/"],"url":"https:\/\/magtel.es\/en\/author\/magtel\/"}]}},"taxonomy_info":{"category":[{"value":1360,"label":"Instalaciones Ferroviarias"},{"value":910,"label":"Present"}],"post_tag":[{"value":1700,"label":"CAF"},{"value":1701,"label":"fibra \u00f3ptica"},{"value":1702,"label":"L\u00ednea 400"},{"value":1703,"label":"seguridad ferroviaria"},{"value":1704,"label":"UTE CAF\u2011Magtel"}]},"featured_image_src_large":["https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119-1024x683.png",1024,683,true],"author_info":{"display_name":"Magtel","author_link":"https:\/\/magtel.es\/en\/author\/magtel\/"},"comment_info":0,"category_info":[{"term_id":1360,"name":"Instalaciones Ferroviarias","slug":"instalaciones-ferroviarias-proyectos","term_group":0,"term_taxonomy_id":1360,"taxonomy":"category","description":"","parent":0,"count":1,"filter":"raw","cat_ID":1360,"category_count":1,"category_description":"","cat_name":"Instalaciones Ferroviarias","category_nicename":"instalaciones-ferroviarias-proyectos","category_parent":0},{"term_id":910,"name":"Present","slug":"present","term_group":0,"term_taxonomy_id":910,"taxonomy":"category","description":"","parent":0,"count":109,"filter":"raw","cat_ID":910,"category_count":109,"category_description":"","cat_name":"Present","category_nicename":"present","category_parent":0}],"tag_info":[{"term_id":1700,"name":"CAF","slug":"caf","term_group":0,"term_taxonomy_id":1700,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1701,"name":"fibra \u00f3ptica","slug":"fibra-optica","term_group":0,"term_taxonomy_id":1701,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1702,"name":"L\u00ednea 400","slug":"linea-400","term_group":0,"term_taxonomy_id":1702,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1703,"name":"seguridad ferroviaria","slug":"seguridad-ferroviaria","term_group":0,"term_taxonomy_id":1703,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1704,"name":"UTE CAF\u2011Magtel","slug":"ute-caf-magtel","term_group":0,"term_taxonomy_id":1704,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"}],"_links":{"self":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/31910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/comments?post=31910"}],"version-history":[{"count":5,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/31910\/revisions"}],"predecessor-version":[{"id":35029,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/31910\/revisions\/35029"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media\/31906"}],"wp:attachment":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media?parent=31910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/categories?post=31910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/tags?post=31910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}