{"id":31910,"date":"2026-09-09T08:37:44","date_gmt":"2026-09-09T06:37:44","guid":{"rendered":"https:\/\/magtel.es\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"},"modified":"2026-09-09T08:47:46","modified_gmt":"2026-09-09T06:47:46","slug":"la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba","status":"publish","type":"post","link":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","title":{"rendered":"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">Project award and scope of works<\/h4>\n\n\n\n<p>The CAF-Magtel consortium has launched the first phase of the contract for the modernisation of the safety systems on the Espeluy-C\u00f3rdoba railway section through the preparation of the detailed design and the subsequent execution of the safety infrastructure renewal works on Line 400. Covering 130 kilometres of track, the project will deliver a comprehensive upgrade of signalling and control systems, improving the safety, reliability and availability of the railway infrastructure.<\/p>\n\n\n\n<p>Following the signing of the contract on 4 May 2026 and the first coordination meeting between ADIF, the Works Management Team, Technical Assistance and the awarded consortium, the initial site surveying and setting-out activities have already been carried out in coordination with ADIF personnel. The preparation of the detailed design is currently underway and, together with its review process, will be completed over the next seven months. Once this phase is concluded, the safety renewal works are scheduled to commence in June 2027 and continue until January 2030.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Station Upgrades and Safety Systems<\/h4>\n\n\n\n<p>New interlockings will be installed at the following stations: Campus Universitario de Rabanales, Alcolea de C\u00f3rdoba, Los Cansinos, Villafranca de C\u00f3rdoba, El Carpio de C\u00f3rdoba, Pedro Abad, Montoro, Villa del R\u00edo, Los Siles, Marmolejo, Arjonilla, And\u00fajar, Villanueva de la Reina, Espeluy, Tri\u00e1ngulo de Espeluy, Meng\u00edbar-Artichuela and Ja\u00e9n.<\/p>\n\n\n\n<p>In addition, CAF and Magtel will jointly construct technical buildings and equipment shelters to accommodate the new signalling equipment required for railway operations.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Signalling, Train Detection and Railway Control<\/h4>\n\n\n\n<p>The project also includes the installation of a range of key systems for railway operations, including Digital ASFA, LED signals, electromechanical point machines and new train detection systems.<\/p>\n\n\n\n<p>Under the planned configuration, axle counters will be deployed at stations and along the Ja\u00e9n-Espeluy section, while the remainder of the route will be equipped with audio-frequency track circuits.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Communications, video surveillance and fibre optic networks<\/h4>\n\n\n\n<p>Magtel will be responsible for the complete dismantling and removal of the existing infrastructure, associated civil works and the deployment of the new fibre-optic network, including both main and secondary cabling, together with all related splices and connections. This network will integrate the new trackside equipment and ensure the operational performance of the entire installation.<\/p>\n\n\n\n<p>The company will also deliver the power supply systems, including cabling, transformer substations and backup systems, as well as railway operational telephony. In collaboration with CAF, Magtel will deploy train-to-ground communications systems, CCTV, access control systems and level crossing protection systems, further strengthening the modernisation and safety of this strategic railway infrastructure.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project award and scope of works The CAF-Magtel consortium has launched the first phase of the contract for the modernisation of the safety systems on the Espeluy-C\u00f3rdoba railway section through the preparation of the detailed design and the subsequent execution of the safety infrastructure renewal works on Line 400. Covering 130 kilometres of track, the&#8230;<\/p>\n","protected":false},"author":2,"featured_media":31906,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1360,910],"tags":[1700,1701,1702,1703,1704],"class_list":["post-31910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-instalaciones-ferroviarias-proyectos","category-present","tag-caf","tag-fibra-optica","tag-linea-400","tag-seguridad-ferroviaria","tag-ute-caf-magtel"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section - Magtel<\/title>\n<meta name=\"description\" content=\"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section - Magtel\" \/>\n<meta property=\"og:description\" content=\"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion\" \/>\n<meta property=\"og:url\" content=\"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/\" \/>\n<meta property=\"og:site_name\" content=\"Magtel\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-09T06:37:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-09T06:47:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Magtel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Magtel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\"},\"author\":{\"name\":\"Magtel\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\"},\"headline\":\"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section\",\"datePublished\":\"2026-09-09T06:37:44+00:00\",\"dateModified\":\"2026-09-09T06:47:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\"},\"wordCount\":432,\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"keywords\":[\"CAF\",\"fibra \u00f3ptica\",\"L\u00ednea 400\",\"seguridad ferroviaria\",\"UTE CAF\u2011Magtel\"],\"articleSection\":[\"Instalaciones Ferroviarias\",\"Present\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\",\"name\":\"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section - Magtel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"datePublished\":\"2026-09-09T06:37:44+00:00\",\"dateModified\":\"2026-09-09T06:47:46+00:00\",\"description\":\"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#primaryimage\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Captura-de-pantalla-2026-04-21-132119.png\",\"width\":1158,\"height\":772},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/magtel.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"name\":\"Magtel\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/magtel.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#organization\",\"name\":\"Magtel\",\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"contentUrl\":\"https:\\\/\\\/magtel.es\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png\",\"width\":1808,\"height\":407,\"caption\":\"Magtel\"},\"image\":{\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/magtel.es\\\/en\\\/#\\\/schema\\\/person\\\/046e29ded6174634c320130d53bc45ac\",\"name\":\"Magtel\",\"sameAs\":[\"https:\\\/\\\/www.magtel.es\\\/\"],\"url\":\"https:\\\/\\\/magtel.es\\\/en\\\/author\\\/magtel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section - Magtel","description":"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","og_locale":"en_US","og_type":"article","og_title":"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section - Magtel","og_description":"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion","og_url":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","og_site_name":"Magtel","article_published_time":"2026-09-09T06:37:44+00:00","article_modified_time":"2026-09-09T06:47:46+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119-1024x683.png","type":"image\/png"}],"author":"Magtel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Magtel","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#article","isPartOf":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"},"author":{"name":"Magtel","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac"},"headline":"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section","datePublished":"2026-09-09T06:37:44+00:00","dateModified":"2026-09-09T06:47:46+00:00","mainEntityOfPage":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"},"wordCount":432,"publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"image":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","keywords":["CAF","fibra \u00f3ptica","L\u00ednea 400","seguridad ferroviaria","UTE CAF\u2011Magtel"],"articleSection":["Instalaciones Ferroviarias","Present"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","url":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/","name":"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section - Magtel","isPartOf":{"@id":"https:\/\/magtel.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage"},"image":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage"},"thumbnailUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","datePublished":"2026-09-09T06:37:44+00:00","dateModified":"2026-09-09T06:47:46+00:00","description":"La UTE CAF\u2011Magtel modernizar\u00e1 la seguridad del tramo Espeluy\u2011C\u00f3rdoba con nuevos sistemas de se\u00f1alizaci\u00f3n, control y comunicacion","breadcrumb":{"@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#primaryimage","url":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119.png","width":1158,"height":772},{"@type":"BreadcrumbList","@id":"https:\/\/magtel.es\/en\/la-ute-caf-magtel-modernizara-la-seguridad-del-tramo-espeluy-cordoba\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/magtel.es\/en\/"},{"@type":"ListItem","position":2,"name":"CAF-Magtel Consortium to Upgrade Safety Systems on the Espeluy-C\u00f3rdoba Railway Section"}]},{"@type":"WebSite","@id":"https:\/\/magtel.es\/en\/#website","url":"https:\/\/magtel.es\/en\/","name":"Magtel","description":"","publisher":{"@id":"https:\/\/magtel.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/magtel.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/magtel.es\/en\/#organization","name":"Magtel","url":"https:\/\/magtel.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","contentUrl":"https:\/\/magtel.es\/wp-content\/uploads\/2025\/03\/cropped-Logo-Magtel-2025_Logo-horizontal-positivo-1.png","width":1808,"height":407,"caption":"Magtel"},"image":{"@id":"https:\/\/magtel.es\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/magtel.es\/en\/#\/schema\/person\/046e29ded6174634c320130d53bc45ac","name":"Magtel","sameAs":["https:\/\/www.magtel.es\/"],"url":"https:\/\/magtel.es\/en\/author\/magtel\/"}]}},"taxonomy_info":{"category":[{"value":1360,"label":"Instalaciones Ferroviarias"},{"value":910,"label":"Present"}],"post_tag":[{"value":1700,"label":"CAF"},{"value":1701,"label":"fibra \u00f3ptica"},{"value":1702,"label":"L\u00ednea 400"},{"value":1703,"label":"seguridad ferroviaria"},{"value":1704,"label":"UTE CAF\u2011Magtel"}]},"featured_image_src_large":["https:\/\/magtel.es\/wp-content\/uploads\/2026\/04\/Captura-de-pantalla-2026-04-21-132119-1024x683.png",1024,683,true],"author_info":{"display_name":"Magtel","author_link":"https:\/\/magtel.es\/en\/author\/magtel\/"},"comment_info":0,"category_info":[{"term_id":1360,"name":"Instalaciones Ferroviarias","slug":"instalaciones-ferroviarias-proyectos","term_group":0,"term_taxonomy_id":1360,"taxonomy":"category","description":"","parent":0,"count":1,"filter":"raw","cat_ID":1360,"category_count":1,"category_description":"","cat_name":"Instalaciones Ferroviarias","category_nicename":"instalaciones-ferroviarias-proyectos","category_parent":0},{"term_id":910,"name":"Present","slug":"present","term_group":0,"term_taxonomy_id":910,"taxonomy":"category","description":"","parent":0,"count":104,"filter":"raw","cat_ID":910,"category_count":104,"category_description":"","cat_name":"Present","category_nicename":"present","category_parent":0}],"tag_info":[{"term_id":1700,"name":"CAF","slug":"caf","term_group":0,"term_taxonomy_id":1700,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1701,"name":"fibra \u00f3ptica","slug":"fibra-optica","term_group":0,"term_taxonomy_id":1701,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1702,"name":"L\u00ednea 400","slug":"linea-400","term_group":0,"term_taxonomy_id":1702,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1703,"name":"seguridad ferroviaria","slug":"seguridad-ferroviaria","term_group":0,"term_taxonomy_id":1703,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":1704,"name":"UTE CAF\u2011Magtel","slug":"ute-caf-magtel","term_group":0,"term_taxonomy_id":1704,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"}],"_links":{"self":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/31910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/comments?post=31910"}],"version-history":[{"count":3,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/31910\/revisions"}],"predecessor-version":[{"id":35023,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/posts\/31910\/revisions\/35023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media\/31906"}],"wp:attachment":[{"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/media?parent=31910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/categories?post=31910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/magtel.es\/en\/wp-json\/wp\/v2\/tags?post=31910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}