Underground power networks

Underground power networks
  • > Developed for: Endesa - Grupo Enel
  • > Location: Alcalá de Guadaira, Dos Hermanas, Utrera, Los Palacios y El Cuervo. Municipios de la provincia de Sevilla (España)
  • > Execution Time: 2 años
  • > Canalization: Redes eléctricas de MT/BT con galerías y 2.525 metros de canalización soterrada

Underground power networks


Magtel executed a 2.5 km underground power network in Seville province for the company Endesa – Grupo Enel.

 

Other power grid deployment and maintenance works undertaken for Endesa -Grupo Enel include the construction of a 2.5 km underground grid built in Seville province and affecting the municipalities of Alcalá de Guadaira, Dos Hermanas, Utrera, Los Palacios and El Cuervo.

Endesa has for many years trusted in Magtel’s know-how for the operation and maintenance of its medium and low voltage distribution grids, as well as for the supervision of other infrastructures in the different countries where Magtel has a presence.

 